Updated Schedule for Door Painting

Updated Painting Schedule for the remainder of the project:

Tuesday, May 14, 2024: Painting of 15th and 16th floor entry doors  

Wednesday, May 15, 2024: Painting of 17th floor entry doors and the Freight Elevator  

Thursday, May 16, 2024: Painting of 5th floor entry doors and Elevator 2

Friday, May 17, 2024: Residual follow-up and painting of Elevator 3 


Given that Elevator 3 is the sole elevator servicing the garages, I understand that its temporary closure may pose an inconvenience. To mitigate this, I encourage residents to consider parking in the lot on Friday, May 17, 2024, if use of the elevator is necessary to gain access to your vehicle between 8:00 a.m. – 8:00 p.m. (The end time may be sooner, depending on the timeframe necessary to paint the elevator doors). 

The garage will remain accessible, just not the elevator servicing the garage. 


To ensure adequate time for painting and drying, please note that one elevator will be out of service from 8:00 a.m. to 8:00 p.m. on each of these scheduled days. Again, the end time may vary, depending on the timeframe necessary to paint the elevator doors.

Recent Posts

See All

Asphalt Repairs

Dear Residents, We would like to inform you that Rose Paving will be conducting additional asphalt repairs on Friday, April 19, 2024,...

In-Unit Surveys

Just a quick reminder that the in-unit surveys will be starting next week.

Comments


bottom of page